Kane is currently on site with the shell & core MEP package on the 41 Tower Hill project, with an anticipated completion date in Q3 of 2025.
The scope of works includes:
- Centralised ventilation systems
- VRF air conditioning system
- Foul & rainwater drainage
- 6no. ASHPs for domestic hot water generation
- Potable water systems, including booster sets, storage tanks & calorifier
- Switchgear, ATS's & Distribution boards
- Life Safety Generator
- Monitored and addressable L1 Fire alarm system
- General Lighting & small power systems
- Security & access control systems
- Audio visual systems
More information to follow as the project progresses