41 Tower Hill

  • Commercial
  • Location
    London
  • Client
    CR Construction (U.K.) Company Limited
  • Contract Value
    £15.7m
  • Sector
    Commercial
  • Duration
    12 months

Kane is currently on site with the shell & core MEP package on the 41 Tower Hill project, with an anticipated completion date in Q3 of 2025.

The scope of works includes:

  • Centralised ventilation systems
  • VRF air conditioning system
  • Foul & rainwater drainage
  • 6no. ASHPs for domestic hot water generation
  • Potable water systems, including booster sets, storage tanks & calorifier
  • Switchgear, ATS's & Distribution boards
  • Life Safety Generator
  • Monitored and addressable L1 Fire alarm system
  • General Lighting & small power systems
  • Security & access control systems
  • Audio visual systems

More information to follow as the project progresses