Kane were appointed by Bouygues UK to deliver the Mechanical Services Installations to Bow Road School. The main block consisted of a 4-storey teaching and sports building with a separate single-storey dining pavilion and a two-storey assembly hall.
The Mechanical Services Installation design and build works package included:
- Calorifiers
- Air Conditioning
- Heat Recovery Ventilation
- Sprinkler System
- Gas Boilers
- Domestic Hot Water Plate Heat Exchangers
- Central Plantroom including Combined Heat and Power Units