Kane were appointed by main contractor Bennett Construction to deliver the mechanical, electrical and plumbing installations at Buckle Street Studios by Locke. The 11-month contract included the MEP installation over 11 floors of the 104 bedroom boutique hotel.
The works package included:
- VRF Air Conditioning
- Mechanical Ventilation
- Fire Fighting Systems
- Public Health Systems
- General & Small Power installation
- General & Emergency Lighting
- Building Management Systems
- Security Systems
- Lighting Controls