Appointed by EcoWorld, Kane delivered the £12.7 million Design & Build MEP Installation at Capital Court. The 16-month contract included the full MEP installation to 253 apartments across 3 blocks and ranging 8, 12 and 13 stories. Full use of 3D co-ordinated M&E model was utilised by our in-house design team, with BIM360 cloud platform for collaboration with the operations team.

The Low Temperature Hot Water (LTHW) requirements were served from a site-specific Energy Centre containing Combined Heating and Power (CHP) unit and Gas Fired Boilers which were manufactured off-site at our Prefabrication facility at Head Office as well as the mechanical risers. Busbars were utilized for the main distribution for residential and landlord supplies.

Further works included the full fit out of the Landlord and amenity areas which included state-of-the-art office space, breakout areas, cinema and gym facilities.

The MEP works package included:

  • Low Temperature Hot Water (LTHW)
  • Power (CHP) united and Gas Fired Boilers
  • Access Control
  • Door Entry System
  • Fire Alarm
  • CCTV
  • Fibre Optic IRS System
  • Car Charging (Pod Point & Rolec)
  • Two Level Car Parking
  • Wet Sprinkler System
  • Dry Sprinkler System
  • Underground Sprinkler Pumping Station
20221004 150802
20221004 151531
20221004 145839
20221004 151357
20221004 150129
20221004 160121
20221004 154602
20221004 142909 1

"Kane were listed onto our project tender list, pursuant to very strong references from our JV partner Willmott Dixon and positive start on the Kew Phase 1 project. Once the tender process had commenced, Kane demonstrated a strong desire to provide us value from Day 1.

Once in contract, Kane have moved to deliver the exact strong service that they had promised, irrespective of challenging market conditions. The speed and quality of their Design portion was hugely impressive, as was their initial setting out and QA systems. Within a period of just over 12 months from the commencement of Fit-Out proper, Kane breezed through 253nr units and to a very high-quality finish. Ricky and Damien were always in close contact with our project delivery team, and we maintained a superb working relationship to collaboratively tackle any issues as and when they arose."

Danny Dowling
Commercial Manager for EcoWorld
Your browser is out-of-date!

Update your browser to view this website correctly. Update my browser now

×