Kane were appointed by Maybourne Hotel Group to deliver the MEP installation at Claridge's Hotel, Mayfair, London. The contract included the design, prefabrication and installation of the Energy Centre 5 floors below ground level.
The works package included:
- Combined Heat and Power Systems
- Gas Boilers
- Chillers
- Fan Coil Units
- Centralised Vent System
- 24No Air Handling Units
- Emergency Lighting Monitoring System
- Backup Generator
- CCTV
- Fire Protection
- Alarm and Access Control System