Awarded by EcoWorld, Kane delivered the Design & Build MEP Installation of Phase one at Kew Bridge development in Brentford, situated close to the new Brentford FC Community Stadium. The project consisted of the new build construction of 256 apartments for private rent tenure.
The works package included:
Low Temperature Hot Water (LTHW)
Power (CHP) united and Gas Fired Boilers manufactured
TV Systems fully commissioned
Car Chargers installed in the basement area
Fire Alarm
CCTV
Access Control
Door Access Systems
Basement Works