Kew Bridge

  • Residential
  • Location
    Kew Bridge, London
  • Client
    EcoWorld
  • Developer
    EcoWorld
  • Contract Value
    £11.5 Million
  • Type
    Residential
  • Duration
    18 months

Awarded by EcoWorld, Kane delivered the Design & Build MEP Installation of Phase one at Kew Bridge development in Brentford, situated close to the new Brentford FC Community Stadium. The project consisted of the new build construction of 256 apartments for private rent tenure.

The works package included:

  • Low Temperature Hot Water (LTHW)

  • Power (CHP) united and Gas Fired Boilers manufactured

  • TV Systems fully commissioned

  • Car Chargers installed in the basement area

  • Fire Alarm

  • CCTV

  • Access Control

  • Door Access Systems

  • Basement Works

3557b58a 591d 4a57 b1fd ce722eb5a13c
6437974d f82f 44c1 b800 043b40d776a2
99c7db89 a907 4c2a 90a4 8ddf04ccd632
6c098d9d 01c2 4bfc a78b b8854d064d01
Bfb1d467 806b 44da 8e15 57a6cf2a85c7
83c071ca 790e 4be8 a4ec 2d2d3eaec164
8bfc805e a8bf 4be5 8d9e 18a855a77a2a
B7776acc e621 4142 a23a ed3637cc1da9
Your browser is out-of-date!

Update your browser to view this website correctly. Update my browser now

×