skip to main content

Tiger Way

  • Residential
  • Education
  • Location
    Hackney, East London
  • Client
    McLaren Construction
  • Developer
    Hackney Council & Londonewcastle
  • Contract Value
    £8.7 Million
  • Type
    Residential & Educational
  • Duration
    15 Months

Kane were appointed by McLaren Construction to deliver the Mechanical Services Installation at Tiger Way 2-Storey Primary School and the MEP Services Installation to the adjoining 13-storey residential complex encompassing 97 high specification apartments.

The design and build works package for the 2-Storey primary School included:

  • Domestic hot water plate heat exchangers
  • Air Conditioning
  • Heat Recovery Ventilation
  • Sprinkler System
  • General Purpose and Emergency Lighting
  • Lighting Controls
  • Fire Detection and Security Installation
  • Data cabling and Equipment Installation
  • Door Entry / access system installation
  • Closed Circuit Television
  • Central Plantroom including Combined Heat and Powers Systems and Gas Boilers

The MEP works package for the 13-Storey residential complex included:

  • Intake Plantrooms inclusive of Plate Heat Exchangers
  • Building Management System and Apartment Controls Systems
  • Residential Sprinkler System
  • Solar Photovoltaic Panels
  • Access Control and Video Entry
  • CCTV Installation
  • Lighting and Lighting Control
  • Home Automation
  • Smoke Ventilation System including Environmental Corridor System
Your browser is out-of-date!

Update your browser to view this website correctly. Update my browser now

×